Hyundai r35z-7 Workshop Manual page 227

Hide thumbs Also See for r35z-7:
Table of Contents

Advertisement

4)
TRACK REVOLUTION SPEED
(1)
Measure the track revolution cycle time
with the track raised off ground.
(2)
Preparation
Adjust the tension of both side tracks to
be equal.
On the track to be measured, mark one
shoe with chalk.
Swing the upperstructure 90
the bucket to raise the track off ground.
Keep the boom-arm angle between 90 to
110 as shown. Place blocks under
machine frame.
Keep the hydraulic oil temperature at 50
5 C.
M
M
easurement
( ( 3)
Select the following switch positions.
Travel mode switch : 1 or 2 speed
Operate the travel control lever of the
raised track in full forward and reverse.
Rotate 1 turn, then measure time taken
for next 3 revolutions.
Raise the other side of machine and
repeat the procedure.
Repeat steps
calculate the average values.
( ( 4)
E
E
valuation
The revolution cycle time of each track should meet the following specifications.
Model
R35Z-7
and lower
and
three times and
Travel speed
1 Speed
2 Speed
Standard
19.3
2.0
10.6 2.0
6-6
90 ~ 110
Mark
R35Z76MC06
Unit : Seconds / 3 revolutions
Maximum allowable
24.0
13.2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents