Operation Verification - Alvarion BreezeMAX PRO 5000 CPE Product Manual

Cpe subscriber units
Table of Contents

Advertisement

Chapter 3 - Commissioning
3.5

Operation Verification

To verify proper operation of the PRO CPE, examine the LED indicators on the IDU
(see
Table
NOTE
Verifying the correct operation of the ODU using the SAU LEDs is meaningful only after the
configuration and alignment processes are completed, and the unit is synchronized with a BS.
To verify proper connection to the end-user's data equipment, examine the
Ethernet Integrity and Ethernet Activity LEDs of the Ethernet connectors.
To verify data connectivity, from the end-user's PC or from a portable PC
connected to the unit, ping a known device in the network, or connect to the
Internet.
BreezeMAX PRO 5000 CPE
2-5) and the SAU (see
Table
3-2).
40
Operation Verification
Product Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents