Mitsubishi Electric NZ2GF2B-60TCTT4 User Manual page 96

Cc-link ie field network temperature control module
Table of Contents

Advertisement

● The time taken for the LINK LED to turn on after connection of the cable may vary. The LINK LED normally turns on in a
few second. However, if link-up processing is repeated due to a condition of a device on the line, the longer time may be
required. If the LINK LED does not turn on, refer to the following and take a corrective action.
Page 281, Section 11.4 (8)
● PORT1 and PORT2 need not to be distinguished. When only one connector is used in star topology, either PORT1 or
PORT2 can be connected.
● When two connectors are used in line topology or ring topology, an Ethernet cable can be connected to the connectors in
any combination. For example, the cable can be connected between PORT1s and between PORT1 and PORT2.
Connection between
PORT1s or PORT2s
● For details on the star topology, line topology or ring topology, refer to the following.
 User's manual for the master/local module used
(b) Disconnecting
94
Either one can be used.
Connection between
PORT1 and PORT2
1.
Power off the module.
2.
Pressing the latch down, unplug the Ethernet cable.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nz2gf2b-60tcrt4

Table of Contents