Installing the Ferrite Bead on Ribbon Connectors
If the ferrite bead is closed, place the bead on a flat surface.
a.
Insert a small flat-blade screwdriver into the recessed area under each of the two locking tabs.
Carefully pry outward to unlock the mechanism.
b.
Place the first open ferrite bead on the cable 8 inches from the end of the ribbon connector that is to be
Step 2
attached to the RBBN-16-T1E1 back card (see
Snap the ferrite bead closed by pressing each half together until the two locking mechanisms snap firmly
shut.
Place the second open ferrite bead on the same cable 60 inches from the end of the ribbon connector that
Step 3
is to be attached to the RBBN-16-T1E1 back card.
Snap the ferrite bead closed by pressing each half together until the two locking mechanisms snap firmly
shut.
To secure the beads, fasten one wire zip tie around the cable on each side of each bead.
Step 4
Ensure that the ties are up against each side of the bead.
(Optional) Repeat
Step 5
card.
Figure 5-89
RBBN
16-T1E1
Cisco MGX 8800/8900 Series Hardware Installation Guide
5-136
Step 1
through
Step 4
Place Two Ferrite Beads on the Cables that Lead to Connectors 3 and 4
1
2
T
3
X
R
4
X
Chapter 5
Figure
5-86).
for the other cable that connects to the RBBN-16-T1E1 back
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Installing the Cisco MGX Switch or Gateway