Chapter 5
Installing the Cisco MGX Switch or Gateway
Table 5-3
Installation Checklist—MGX 8950 System (continued)
Rack-Mounted System
Check Steps
(Without Lift)
Step 8
Install the MGX 8950 Switch with
a Mechanical Lift
Prepare for Installation
•
Remove the Front Cards
•
Remove the Back Cards
•
Remove the Back Cards from
•
an APS Assembly
Install the Switch in the Rack
•
Reinstall the APS Assembly
•
Reinstall the Back Cards
•
Reinstall the Front Cards
•
Step 9
Install the Upper Fan Tray
Step 10
Install the Exhaust Plenum
Step 11
Install the DC PEM(s), as necessary
Step 12
Install the Cable Management Assembly
Step 13
Connect the Fan Tray Power Cables to the MGX 8950 Switch
Step 14
Connect the AC Power Supply Tray to the MGX 8950 Switch,
as necessary
Step 15
Connect the DC PEM to the MGX 8950 Switch, as necessary
Step 16
Connect the Back Cards
Step 17
Connect the Console Port
Step 18
Connect Power to the MGX 8950 Switch
•
Connect AC Power to the Switch
Connect the Console Port
•
Step 19
Connect the External Clock (optional)
Step 20
Connect the Alarms (optional)
Step 21
Connect the MP Connection (optional)
Step 22
Connect the LAN1/2 Ports (optional)
Step 23
Verify EMI Compliance
After completing these steps, proceed to the
Note
section on page 5-137
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Rack-Mounted System (with Lift)
Install the MGX 8950 Switch with
a Mechanical Lift
Install the Switch in a 19-Inch
•
or 23-Inch Rack
•
Install the Switch in a 19-Inch
Cabinet
"First Time Power On Procedure for MGX Switches"
if this is a first-time installation.
Cisco MGX 8800/8900 Series Hardware Installation Guide
Installing the MGX 8950 Switch
Cisco Cabinet System
Connect Power to the MGX 8950
Switch
Connect AC Power to the
•
Switch
•
Connect the Console Port
Connect the External Clock
(optional)
Connect the Alarms (optional)
Connect the MP Connection
(optional)
Connect the LAN1/2 Ports
(optional)
Verify EMI Compliance
5-51