Step 8
Repeat
Step 9
Install blank faceplates over any empty slots.
Reinstall the Front Cards
All cards must be fully seated in the chassis. When installing the front card, apply even pressure to the
Note
top and bottom of the faceplate to make sure that the card is fully seated.
The card should slide in and out with only slight friction on the adjacent board's EMI gaskets. Do not
force the card. Investigate any binding.
Each single-height front card has an extractor lever at the top of the faceplate to secure it in the card cage.
Each double-height front card has an extractor lever at both the top and the bottom of the faceplate.
Caution
If the AXSM-1-2488 or AXSM-1-2488/B front cards are installed with incorrect back cards, damage to
the cards might result.
To prevent damage to components on the bottom side of a card, support the faceplate and keep the card
Caution
level while sliding it into the switch.
Blank faceplates and cover panels serve three important functions: they prevent exposure to
Warning
hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI)
that might disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not
operate the system unless all cards, faceplates, front covers, and rear covers are in place.
Statement 1029
Complete the following steps to reinstall a front card in the MGX 8950 switch:
Step 1
Refer to the notes you made when you recorded the location of each card to ensure that the cards are
installed in the correct slots. For slot assignments for your system, refer to the
Compartment" section on page
See the
Step 2
bent dividers, or damaged connectors on the back cards.
Verify that the extractor lever(s) are in the unlatched position.
Step 3
Position the front card over the appropriate slot and align the front card edge with the slot guides (top
Step 4
and bottom) in the chassis.
Lift up and out on the extractor lever(s) and gently apply pressure to the faceplate while pushing the front
Step 5
card into the slot.
Once the front card is installed in the chassis, apply even pressure to the top and bottom of the faceplate
Step 6
to fully seat the front card.
Press down on the extractor lever(s) until they latch to secure the front card.
Step 7
Releases 2 - 5.2, Part Number OL-4545-01, Rev. H0, May 2006
Step 2
through
Step 7
for each back card that you are reinstalling in the chassis.
1-36.
"General Card Installation Guidelines" section on page 3-8
to verify that there are no bent pins,
Cisco MGX 8800/8900 Series Hardware Installation Guide
Installing the MGX 8950 Switch
"MGX 8950 Card
5-73

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgx 8900 series

Table of Contents