Two Piece Bracket Maintenance - JLG 1200SJP Service Maintenance Manual

Hide thumbs Also See for 1200SJP:
Table of Contents

Advertisement

10. Push down with slight pressure on the link and slide the
bracket side up and over the extrusion on the link.
11. Repeat the previous step on the other side.
12. Slide the bracket off of the powertrack.
3121142

Two Piece Bracket Maintenance

1. Loosen the screw.
2. Slide the roller off the bar.
3. Hold the bar tightly and remove the other screw.
– JLG Lift –
SECTION 4 - BOOM & PLATFORM
4-55

Advertisement

Table of Contents
loading

This manual is also suitable for:

1350sjp

Table of Contents