10. Hit ENTER. The screen should read:
11.
Hit ENTER again to calibrate level sensors.
12. When calibration has been successful CAL. COMPLETE
should appear.
13. Cycle power to the machine.
3121142
STEP 3: BLEEDING THE PLATFORM VALVES
1. Position the Platform/Ground select switch to the
Ground position.
2. Plug the analyzer into the connector inside the Ground
control box.
3. Pull out the Emergency Stop switch and start the
engine.
– JLG Lift –
SECTION 6 - JLG CONTROL SYSTEM
6-57