Starting Up; Mains Connection; Switching On - Lauda PROLINE P 5 C Operating Instructions Manual

Hide thumbs Also See for PROLINE P 5 C:
Table of Contents

Advertisement

7

Starting up

7.1

Mains connection

Compare the rating on the nameplate (back of control head) with the mains voltage.
7.2

Switching on

Self-test
88(((
Bath temperature
02%32
Overtemperatu. cut-off.
90
02/2022
 Connect unit only to sockets with a protective earth conductor (PE).
 No liability is accepted for incorrect mains connections!
 Ensure that pump connectors without external loads are closed off.
 Ensure that the unit is filled according to Section 6.3.
Note for electric installation on site:
The devices must be protected with a 16 ampere circuit breaker fitted during installation.
Exception: Devices with 13 ampere UK plugs.
Check whether the main fuse switch at the back is in the 'On =
Switch on the mains switch :
 The green LED for 'Mains ON' is lit,
 an acoustic signal is emitted for about 1 s.
1 s
 The unit starts its self-test. All display segments and symbols appear for about
1 second.
°C
EXT
 The momentary bath temperature is displayed,
 the pump starts provided 'Standby' or 'Manual start' ( Section 7.8.2) has
°C
not been programmed,
 all values are accepted which were active before switch-off.
Check or set overtemperature cut-off point:
 The switching point is shown in the LED display on pressing the key
°C
 Change overtemperature cut-off ( Section 7.14.1) Overtemperature pro-
tection and checking on page 80.
 If necessary, top up heat transfer liquid which has been pumped out by filling
the external load.
Proline heating thermostat
' position.
.
27 / 123

Advertisement

Table of Contents
loading

Table of Contents