Starting up

7.1

Mains connection

Compare the rating on the nameplate (back of control head) with the mains voltage.
7.2

Switching on

Self-test
88(((
Bath temperature
02%32
Overtemperatu. cut-off.
90
28
 Connect unit only to sockets with a protective earth conductor (PE).
 No liability is accepted for incorrect mains connections!
 Ensure that pump connectors without external loads are closed off.
 Ensure that the unit is filled according to Section 6.3.
Note for electric installation on site:
The devices must be protected with a 16 ampere circuit breaker fitted during installation.
Exception: Devices with 13 ampere UK plugs.
Check whether the main fuse switch at the back is in the 'On =
tion.
Switch on the mains switch :
 The green LED for 'Mains ON' is lit,
 an acoustic signal is emitted for about 1 s.
1 s
 The unit starts its self-test. All display segments and symbols ap-
pear for about 1 second.
°C
EXT
 The momentary bath temperature is displayed,
 the pump starts provided 'Standby' or 'Manual start' ( Section
°C
7.8.2) has not been programmed,
 all values are accepted which were active before switch-off.
Check or set overtemperature cut-off point:
 The switching point is shown in the LED display on pressing the key
°C
 Change overtemperature cut-off ( Section 7.14.1) Overtempera-
ture protection and checking on page 79.
 If necessary, top up heat transfer liquid which has been pumped out
by filling the external load.