Preparation; Assembly And Sitting - Lauda PROLINE P 5 C Operating Instructions Manual

Hide thumbs Also See for PROLINE P 5 C:
Table of Contents

Advertisement

6

Preparation

6.1

Assembly and sitting

20 / 123
Operation with external loads
(Circulating thermostat) continue at ( 6.5).
 Check whether the pump connectors at the side and back are fitted with sealing caps
( Section 3) or that hoses are fitted for external loads.
 With bath temperatures over 70 °C the supplied self-adhesive label
be applied on the bath at an easily visible point.
 Do not carry out technical changes on the device!
 The unit can safely operate up to an ambient temperature of 40 °C.
Proline heating thermostat
 Site the unit on a flat surface
 The unit must not be put into operation if its tem-
perature during storage or transport has dropped
below the dew point.
Wait for about one hour.
 Do not cover the ventilation openings at the back
of the control head.
 When used as a bath thermostat put the bypass
valve in "internal" position (without "external load")
( 3).
With the transparent thermostat, the condensation of
humidity can be prevented at minus temperatures. A
thread is cut into the bath bridge. A plug-in nipple can be
screwed in here. The nipple is used to connect nitrogen or
dry air. Only a small volume flow of gas is required.
should
02/2022

Advertisement

Table of Contents
loading

Table of Contents