Connecting External Loads - Lauda PROLINE P 5 C Operating Instructions Manual

Hide thumbs Also See for PROLINE P 5 C:
Table of Contents

Advertisement

6.5

Connecting external loads

Operation as circulating thermostat
26 / 123
Bursting of the external consumer due to overpressure
Use a pressure relief device on pressure-sensitive consumers (e.g. glass reactors).
 If cross-sectional area of tube is too low  temperature gradient between bath and external
load due to low flow rate.
 Always ensure the largest possible passages in the external circuit!
 If external control is to be used, provide a Pt100 probe in the external load
( Section 7.7.2 and 7.7.4).
 When tightening the union nuts on the pump nipple AF 19, use a wrench AF 14 to counter
the tightening torque (see figure).
 With loads at a higher position and with stationary pump and ingress of air into the thermo-
static circuit, the external volume can drain away, even with closed circuits  Risk of ther-
mostat overflowing!
 Secure hoses against slippage with hose clips!
 Unused pump connectors must be closed off.
Proline heating thermostat
Scalding, frostbite, cutting
 When used as circulation thermostat, care for shortest
hose connections with largest inner diameter as possible.
This gives the best flow.
 Push hose with 11
olive or connect metal hoses
( 6.4) to pump connectors.
 Pump connectors at side:
Inlet and outflow  see labeling housing.
 Pump connectors at back
Inlet and outflow  see labeling housing.
 Set bypass valve to "external".
12 mm internal width onto hose
02/2022

Advertisement

Table of Contents
loading

Table of Contents