Installing Transceiver Modules And Fiber Cables - H3C SecPath M9000-AI-E8 Installation Manual

Multi service security gateway series
Hide thumbs Also See for SecPath M9000-AI-E8:
Table of Contents

Advertisement

Connecting an HVDC power cord
The connecting procedure is the same for HVDC and AC power cords. For information about
connecting the power cord for a PSR3000-54AHD power supply, see
cord."

Installing transceiver modules and fiber cables

WARNING!
Disconnected optical fibers or transceiver modules might emit invisible laser light. Do not stare into
beams or view directly with optical instruments when the gateway is operating.
CAUTION:
• Before installing a transceiver module, remove the fiber cables, if any, from it. For more
information about installing transceiver modules, see the installation guide for the transceiver
modules.
• If you are not to use a fiber port or transceiver module, insert dust plugs into the port or module. If
you are not to connect an optical fiber, install dust caps for the fiber connector.
To install a transceiver module and fiber cable:
1.
Wear an ESD wrist strap and make sure the wrist strap is reliably grounded.
2.
Remove the dust plug from the target fiber port.
3.
Pull the bail latch on the transceiver module upwards.
Skip this step if the bail latch is plastic.
4.
Take the transceiver module by its two sides and push the end without the bail latch gently into
the port until it is firmly seated in the fiber port.
5.
Remove the dust plug and dust cap from the transceiver module and fiber connector,
respectively.
6.
Connect the fiber cable to the transceiver module.
LC connector—Align the connector with the transceiver module and push it into the
transceiver module slightly until it clicks into place.
MPO connector—Orient the connector with the white spot on it facing right. Insert the MPO
fiber connector horizontally into the transceiver module. Push the MPO fiber connector into
the transceiver module slightly until it clicks into place.
7.
Use cable ties to bind fiber cables every 150 mm (5.91 in).
8.
Label fiber cables according to the cable labeling specifications.
26
"Connecting an AC power

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e16

Table of Contents