Mounting The Gateway In A Rack - H3C SecPath M9000-AI-E8 Installation Manual

Multi service security gateway series
Hide thumbs Also See for SecPath M9000-AI-E8:
Table of Contents

Advertisement

Figure 4 Removing a fan tray (M9000-AI-E16 gateway)

Mounting the gateway in a rack

CAUTION:
• When you move the gateway to a low temperature environment from a high temperature
environment, condensation might occur. Before installing the gateway, please dry the gateway to
prevent the internal components from being damaged because of short circuit.
• As a best practice, remove the fan trays from the chassis. If you are not to remove the fan trays,
do not hold the handle of a fan tray to move the gateway. Any attempt to carry the gateway by this
part might cause equipment damage or even bodily injury.
• After you place the gateway on the slide rails, do not leave go of your hands immediately
because this might tip the gateway, damaging the gateway or even causing bodily injury.
To mount the gateway in a rack:
1.
Determine the cage nut installation holes according to the holes in the mounting brackets, as
shown in
The mounting brackets have been installed in the chassis. You can use other tools, such as a
tape measure, to align the holes in the mounting brackets with the holes on the rack posts and
mark the cage nut installation holes.
Figure
5. Mark the cage nut installation holes on the front rack post.
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e16

Table of Contents