Figure 3-1 Installation Flow; Chapter 3 Installing The Secpath V100-S - H3C SecPath V100-S Installation Manual

Table of Contents

Advertisement

Installation Manual
H3C SecPath V100-S Security Gateway

Chapter 3 Installing the SecPath V100-S

3.1 Installation Flow
Install the rack (optional)
Mount the security
gateway
Connect the PGND
Connect the power cord
Connect the security gate-
way to the console terminal
Verify the installation
Power up the security gateway
Turn off the power switch
and remove the power cord
Install MIMs (optional)
Connect the security gateway
to the Ethernet interface
Verify the installation
Connect the power
cord and power up

Figure 3-1 Installation flow

Start
NO
OK?
YES
End
Chapter 3 Installing the SecPath V100-S
Troubleshooting
Power down the
security gateway
3-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SecPath V100-S and is the answer not in the manual?

Table of Contents