Installation Flowchart; Rack-Mounting The Gateway - H3C SecPath M9000-AI-E8 Installation Manual

Multi service security gateway series
Hide thumbs Also See for SecPath M9000-AI-E8:
Table of Contents

Advertisement

Installation flowchart

Figure 1 Installation flowchart
Start
Prepare for
installation
Rack-mount the
gateway
Ground the gateway
Install modules
Install fan trays
Install cable
management brackets
Install power
supplies
Connect signal
cables
Check before and
after power-on
Operating
correctly?
Yes
End

Rack-mounting the gateway

CAUTION:
The gateway is heavy. For rack stability, install it at a lowest possible position.
Supervisor engine
modules and switching
fabric modules
Interface modules, AI
security engine modules,
and interface switch
modules
AC power supplies
DC power supplies
HVDC power
supplies
Troubleshoot the
gateway
Power off the
No
gateway
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e16

Table of Contents