Installation flowchart
Figure 1 Installation flowchart
Start
Prepare for
installation
Rack-mount the
gateway
Ground the gateway
Install modules
Install fan trays
Install cable
management brackets
Install power
supplies
Connect signal
cables
Check before and
after power-on
Operating
correctly?
Yes
End
Rack-mounting the gateway
CAUTION:
The gateway is heavy. For rack stability, install it at a lowest possible position.
Supervisor engine
modules and switching
fabric modules
Interface modules, AI
security engine modules,
and interface switch
modules
AC power supplies
DC power supplies
HVDC power
supplies
Troubleshoot the
gateway
Power off the
No
gateway
2