Table of Contents

Advertisement

Quick Links

Contents
1 Preparing for installation ············································································· 1
Inspecting the gateway ······································································································································ 1
ESD prevention ·················································································································································· 1
Examining the installation site ···························································································································· 1
Space ························································································································································· 1
Cooling ······················································································································································· 2
Installation tools and accessories ······················································································································ 3
2 Installing the gateway ················································································· 5
Installation flow··················································································································································· 5
Rack-mounting the gateway······························································································································· 6
Attaching slide rails to the rack ·················································································································· 6
Removing the air filter and top hood ·········································································································· 6
Removing a fan tray ··································································································································· 7
Mounting the gateway in a rack ················································································································· 8
(Optional) Installing an air filter and a top hood ······················································································· 10
Grounding the gateway ···································································································································· 11
Installing cable management brackets ············································································································· 12
Installing cable management brackets for an M9000-AI-E8 gateway ······················································ 12
Installing cable management brackets for an M9000-AI-E16 gateway ···················································· 12
Installing supervisor engine modules ··············································································································· 14
Installing a SEM for an M9000-AI-E8 gateway ························································································ 15
Installing a SEM for an M9000-AI-E16 gateway ······················································································ 15
Installing switching fabric modules ··················································································································· 17
Installing a switching fabric module for an M9000-AI-E8 gateway ··························································· 17
Installing a switching fabric module for an M9000-AI-E16 gateway ························································· 18
Installing interface modules or service modules ······························································································ 19
Installing interface switch modules or AI security engine modules ·································································· 20
Installing fan trays ············································································································································ 21
Installing DC power supplies ···························································································································· 22
Available DC power supplies ··················································································································· 22
DC power supply configuration guidelines ······························································································· 22
Installing a DC power supply ···················································································································· 22
Connecting a DC power cord ··················································································································· 23
Installing AC power supplies ···························································································································· 24
Available AC power supplies ···················································································································· 24
AC power supply configuration guidelines ······························································································· 25
Installing an AC power supply ·················································································································· 25
Connecting an AC power cord ················································································································· 27
Installing HVDC power supplies ······················································································································· 27
HVDC power supply configuration guidelines ·························································································· 27
Installing an HVDC power supply ············································································································· 28
Connecting an HVDC power cord ············································································································ 28
Installing transceiver modules and fiber cables ······························································································· 28
Routing signal cables ······································································································································· 29
(Optional) Installing air filter doors ··················································································································· 30
Verifying the installation ··································································································································· 30
Power-on check ··············································································································································· 31
Power-on check flow ································································································································ 31
Checking the LEDs ·································································································································· 31
3 Appendix A Chassis views and technical specifications ························· 34
Chassis views ·················································································································································· 34
M9000-AI-E8 ············································································································································ 34
M9000-AI-E16 ·········································································································································· 36
Weights and dimensions ·································································································································· 38
i

Advertisement

Table of Contents
loading

Summary of Contents for H3C SecPath M9000-AI

  • Page 1: Table Of Contents

    Contents 1 Preparing for installation ············································································· 1 Inspecting the gateway ······································································································································ 1 ESD prevention ·················································································································································· 1 Examining the installation site ···························································································································· 1 Space ························································································································································· 1 Cooling ······················································································································································· 2 Installation tools and accessories ······················································································································ 3 2 Installing the gateway ················································································· 5 Installation flow···················································································································································...
  • Page 2: Preparing For Installation

    Preparing for installation H3C SecPath M9000-AI multiservice security gateways include the M9000-AI-E8 gateway and M9000-AI-E16 gateway. Inspecting the gateway Before installing the gateway, perform the following steps to inspect all items in the shipping container with the presence of the service party: Check the packing list to verify that all the items are as ordered.
  • Page 3: Cooling

    Figure 1-1 Rack dimensions Front door ≥ 950 mm ≥ 140 mm (37.40 in) (5.51 in) Rear door Chassis Front rack post Rack Table 1-1 Gateway dimensions and rack requirements Model Dimensions Rack requirements • Height—264 mm (10.39 in) • Width—440 mm (17.32 in) •...
  • Page 4: Installation Tools And Accessories

    Figure 1-2 Airflow through the chassis (M9000-AI-E16 gateway) Installation tools and accessories No installation tools are provided with the gateway. Prepare them yourself as required.
  • Page 5 Figure 1-3 Installation tools Figure 1-4 Installation accessories...
  • Page 6: Installing The Gateway

    Installing the gateway Installation flow Figure 2-1 Installation flow Start Inspect the gateway Read safety Prepare for guidelines installation Examine the installation site Rack-mount the Pre pare insta llati on gateway tools an d a ccessories Ground the gateway Install cable manag ement bra ckets SEMs and switching fabric modules...
  • Page 7: Rack-Mounting The Gateway

    Rack-mounting the gateway CAUTION: • The gateway is heavy. For rack stability, install it at a lowest possible position. • Remove fan trays from the gateway before installing the gateway in the rack. Attaching slide rails to the rack Attach the required slide rails to the rack before you mount the gateway in the rack. For more information about attaching slide rails, see the slide rails installation guide.
  • Page 8: Removing A Fan Tray

    Use a Phillips screwdriver to loosen the captive screws and remove the top hood. Figure 2-3 Removing the top hood Removing a fan tray Wear an ESD wrist strap and make sure it is reliably grounded. Loosen the captive screws by using a Phillips screwdriver. Hold the fan tray handle and then pull the fan tray out of the chassis slowly.
  • Page 9: Mounting The Gateway In A Rack

    Figure 2-4 Removing a fan tray (M9000-AI-E16 gateway) Mounting the gateway in a rack CAUTION: • When you move the gateway to a low temperature environment from a high temperature environment, condensation might occur. Before installing the gateway, please dry the gateway to prevent the internal components from being damaged because of short circuit.
  • Page 10 To mount the gateway in a rack: Determine the cage nut installation holes according to the holes in the mounting brackets, as shown in Figure 2-5. Mark the cage nut installation holes on the front rack post. The mounting brackets have been installed in the chassis. You can use other tools, such as a tape measure, to align the holes in the mounting brackets with the holes on the rack posts and mark the cage nut installation holes.
  • Page 11: (Optional) Installing An Air Filter And A Top Hood

    Figure 2-7 Mounting the gateway in a rack (M9000-AI-E16 gateway) (Optional) Installing an air filter and a top hood IMPORTANT: The M9000-AI-E16 gateway supports air filter doors. If you have ordered air filter doors, first install the air filter doors and then install an air filter and a top hood on the M9000-AI-E16 gateway. Only the M9000-AI-E16 gateway supports air filters and top hoods.
  • Page 12: Grounding The Gateway

    Figure 2-8 Installing a top hood Position the air filter over the top hood, and then push the air filter until it is seated into the top hood. Figure 2-9 Installing an air filter Grounding the gateway Unpack the grounding cable. Remove the grounding screws from the grounding holes at the rear of the chassis.
  • Page 13: Installing Cable Management Brackets

    Figure 2-10 Connecting the grounding cable to a grounding strip (M9000-AI-E16 gateway) Installing cable management brackets Installing cable management brackets for an M9000-AI-E8 gateway The cable management brackets have been installed on the two sides of an M9000-AI-E8 gateway when the gateway is shipped. You only need to attach the cable guides to the cable management bracket.
  • Page 14 Figure 2-11 Cable management brackets The installation procedure is similar for cable management brackets at the left side and at the right side. The following installs a cable management brackets at the right side. To install a cable management bracket: If any cable guide hinders installation of the cable management bracket, press the tab on the cable guide and then remove the cable guide from the cable management bracket.
  • Page 15: Installing Supervisor Engine Modules

    Orient the cable management bracket, with the lettering facing upward, and then position the cable management bracket on the mounting bracket. Align the captive screws on the cable management bracket with the holes in the mounting bracket. Fasten the captive screws to secure the cable management bracket. Figure 2-13 Installing a cable management bracket Install the removed cable guide (if any) to the cable management bracket.
  • Page 16: Installing A Sem For An M9000-Ai-E8 Gateway

    Installing a SEM for an M9000-AI-E8 gateway Wear an ESD wrist strap and make sure the wrist strap is reliably grounded. Loosen the captive screws on the filler panel and remove it from the target SEM slot. Correctly orient the SEM, rotate the handle upward, and then push the SEM steadily into the slot along the guide rails.
  • Page 17 Figure 2-15 Removing the filler panel Correctly orient the SEM, insert it into the slot, and then push it steadily into the slot along the guide rails. Fully open the ejector levers of the SEM. Continue to push the SEM by its front panel until the ejector levers make close contact with the slot edges.
  • Page 18: Installing Switching Fabric Modules

    Figure 2-16 Installing a SEM for an M9000-AI-E16 gateway Installing switching fabric modules CAUTION: • Only the NSQM5FAB16A1 switching fabric module is hot swappable. • The M9000-AI-E8 gateway provides four switching fabric module slots. Only slots 6 and 7 are available for installing switching fabric modules.
  • Page 19: Installing A Switching Fabric Module For An M9000-Ai-E16 Gateway

    Correctly orient the switching fabric module. Align the switching fabric module with the target slot and insert it into the slot along the guide rails. Then fully open the ejector levers. Continue to push the switching fabric module by its front panel until the ejector levers make close contact with the slot edges.
  • Page 20: Installing Interface Modules Or Service Modules

    Remove the filler panel from the target switching fabric module slot. Keep the removed filler panel secure for future use. Install the switch fabric module. The installation procedure is similar for switch fabric modules and SEMs. For more information about installing the switch fabric module, see "Installing a SEM for an M9000-AI-E16 gateway."...
  • Page 21: Installing Interface Switch Modules Or Ai Security Engine Modules

    Installing interface switch modules or AI security engine modules CAUTION: • The interface switch modules are hot swappable. • Do not hot swap the NSQM5AIASKA1 and NSQM5AIASKB1 AI security engine modules. • If you are not to install an interface switch module or AI security engine module in a slot, keep the filler panel in the slot.
  • Page 22: Installing Fan Trays

    Installing fan trays An M9000-AI-E8 gateway has two fan tray slots and supports 1+1 fan tray redundancy. As a best practice, install two fan trays for the gateway. To install a fan tray in slot FAN1, orient the fan tray with the LEDs on the left side of the front panel.
  • Page 23: Installing Dc Power Supplies

    Installing DC power supplies Available DC power supplies The PSR2400-54D DC power supply is available for the gateway. Table 2-2 describes the PSR2400-54D DC power supply specifications. Table 2-2 PSR2400-54D power supply specifications Item Specifications Rated input voltage –48 VDC to –60 VDC Input voltage –40 VDC to –72 VDC Maximum input current...
  • Page 24: Connecting A Dc Power Cord

    Figure 2-22 Removing a filler panel (M9000-AI-E16 gateway) Correctly orient the power supply. Align the power supply with the power supply slot. Then slide the power supply along the guide rails into the slot until the latch locks the power supply in place. Figure 2-23 Installing a power supply (M9000-AI-E16 gateway) Connecting a DC power cord WARNING!
  • Page 25: Installing Ac Power Supplies

    Connect the DC power cord connector to the DC input receptacle of the power supply. Fasten the screw on the connector to secure the connector to the receptacle. Connect the other ends of the DC power cords to a DC power source, with the positive wire (+) to the positive terminal and the negative wire (-) to the negative terminal.
  • Page 26: Ac Power Supply Configuration Guidelines

    Table 2-4 PSR3000-54A power supply specifications Item Specifications • 100 VAC to 240 VAC @ 50 or 60 Hz (AC input) Rated input voltage • 240 VDC (high-voltage DC input) • 90 VAC to 290 VAC @ 47 or 63 Hz (AC input) Input voltage •...
  • Page 27 On an M9000-AI-E16 gateway, the power supply slots are located at the top of the rear panel. Make sure the latch is above the handle when you install the power supply. The installation procedure is the same for AC and DC power supplies. The following procedure installs a power supply on an M9000-AI-E16 gateway.
  • Page 28: Connecting An Ac Power Cord

    Connecting an AC power cord CAUTION: • Make sure each power cord has a separate circuit breaker. • Before you connect a power cord, turn off the circuit breaker for it. To connect an AC power cord: Connect the AC power cord connector to the AC input receptacle of the power supply. Connect the other end of the power cord to an AC power source.
  • Page 29: Installing An Hvdc Power Supply

    Installing an HVDC power supply For information about installing a PSR3000-54AHD power supply, see "Installing an AC power supply." Connecting an HVDC power cord For information about connecting the power cord for a PSR3000-54AHD power supply, see "Connecting an AC power cord."...
  • Page 30: Routing Signal Cables

    Figure 2-28 Installing a transceiver modules and fiber cable (with LC fiber connector) Figure 2-29 Installing a transceiver modules and fiber cable (with MPO fiber connector) Routing signal cables The cable management brackets are attached to the chassis front edges on its two sides. As a best practice, route the cables from the left half of the chassis through the left cable management bracket and the cables from the right half of the chassis through the right cable management bracket, as shown in...
  • Page 31: (Optional) Installing Air Filter Doors

    Figure 2-30 Routing cables (M9000-AI-E16 gateway) (Optional) Installing air filter doors The M9000-AI gateway supports air filter doors. For more information about installing air filter doors, see the installation guide for the air filter doors. Verifying the installation Table 2-6 Post-installation checklist Item Requirements •...
  • Page 32: Power-On Check

    Item Requirements • Power cords, grounding cables and fiber cables are routed and bound separately. • The cables are bound neatly with cable ties at an even distance. • The cable labels are correct, clear, and affixed to the cable in the same direction. Electricity safety A circuit breaker is provided for each power input line.
  • Page 33 The gateway SEM provides LEDs for modules installed on the gateway to indicate their operating status. Table 2-7 Table 2-8 describe the LEDs on the SEM. For more information about gateway LEDs, see H3C SecPath M9000-AI Multiservice Security Gateway Installation Guide. Table 2-7 M9000-AI-E8 SEM LED description Status Description FAIL All fan trays are operating correctly.
  • Page 34 Status Description A minimum of one power supply has no power output. Possible reasons include: • The power supply is faulty. Steady red • The switch for the power supply is turned off. • The power cord is connected incorrectly. •...
  • Page 35: Appendix A Chassis Views And Technical Specifications

    Appendix A Chassis views and technical specifications H3C SecPath M9000-AI multiservice security gateways include the M9000-AI-E8 and M9000-AI-E16 models. The main components of the gateway include SEMs, interface switch modules, interface modules, service modules, switching fabric modules, fan trays, and power supplies.
  • Page 36 Figure 3-2 Rear view (3) Power supply section (4) Fan tray section (5) Switching fabric module section Table 3-1 Descriptions for the gateway sections Section Description SEM section No SEMs are provided with the gateway. Purchase SEMs yourself. No interface switch modules or AI security engine modules are provided with the Interface switch gateway.
  • Page 37: M9000-Ai-E16

    M9000-AI-E16 Figure 3-3 Front view (1) SEM section (2) Interface switch module/AI security engine module section (3) Switching fabric module section...
  • Page 38 Figure 3-4 Rear view (4) Power supply section (5) Fan tray section Table 3-2 Descriptions for the gateway sections Section Description SEM section No SEMs are provided with the gateway. Purchase SEMs yourself. No interface switch modules or AI security engine modules are provided with the Interface switch gateway.
  • Page 39: Weights And Dimensions

    NOTE: To install a service module or interface module on the gateway, first install it on an interface switch module and then install that interface switch module on the gateway. Weights and dimensions The weight includes the chassis (filler panels included) and the packing materials. Table 3-3 Chassis weights and dimensions Model Weight...

This manual is also suitable for:

Secpath m9000-ai-e8Secpath m9000-ai-e16

Table of Contents