Installation Tools And Accessories; Pre-Installation Checklist - H3C SecPath M9000-AI-E8 Installation Manual

Multi service security gateway series
Hide thumbs Also See for SecPath M9000-AI-E8:
Table of Contents

Advertisement

Installation tools and accessories

No installation tools are provided with the gateway. Prepare them yourself as required.
Figure 3 Installation tools
Figure 4 Installation accessories

Pre-installation checklist

Table 6 Pre-installation checklist
Item
Installation site
Requirements
The floor or ground at the installation site can
support the sum of the weight of the gateway
and the rack.
Load bearing
The slide rails can support the weight of the
gateway.
There is a minimum clear height of 3 m (9.84
Space
ft) (from the beam or the air duct to the floor) in
7
Result

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e16

Table of Contents