Installing The Gateway; Confirming Installation Preparations - H3C SecPath M9000-AI-E8 Installation Manual

Multi service security gateway series
Hide thumbs Also See for SecPath M9000-AI-E8:
Table of Contents

Advertisement

Installing the gateway

Confirming installation preparations

Before you install the gateway, verify that:
You have read the chapter "Preparing for installation" carefully and the installation site meets all
the requirements.
A 19-inch rack has been installed.
The rack is sturdy and securely grounded.
The rack has enough space to install the gateway and no debris exists inside or around the
rack.
The mounting position of the gateway on the rack has been identified. As a best practice, install
the gateway at the bottom of the rack.
The total height of the devices to be installed in the rack is no higher than the available
installation height of the rack and enough clearance is reserved for cable routing. Make sure the
heaviest device is placed at the bottom of the rack.
The gateway is ready for installation and has been carried to a place near the rack and
convenient for moving.
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Secpath m9000-ai-e16

Table of Contents