Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 47

Advertisement

Step 13: Floor Board Assembly
Part 2
C: Next to (151) Slidenest Floor A place 1 (153) Floor A followed by 6 (152) Floors. Make sure all boards are
evenly spaced and the last (152) Floor is flush to the front of (060) SL Panel. (fig. 13.3, 13.4 and 13.5)
D: Attach the 7 unfastened floor boards to (071) Front Floor, (085) Floor Joist and (073) Back Floor with 6 (S20)
#8 x 1-3/8" Wood Screws per board. (fig. 13.5)
Fig. 13.4
Top View
073
(hidden)
Crowsnest
085
Side Wall
(hidden)
071
(hidden)
Fig. 13.5
Flush
060
Wood Parts
6 x
Floor FSC 1 x 6 x 36"
152
1 x
Floor A FSC 1 x 5 x 36"
153
153
Back
151
152
Front
S20
x 6 per board
42 x
Fig. 13.3
Swing
Flush
Side
Wall
Hardware
#8 x 1-3/8" Wood Screw
S20
47
060

Advertisement

loading

This manual is also suitable for:

F23175