Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 83

Advertisement

Step 30: Final Swing Post Assembly
Pre-drill all holes using a 3/16" drill bit before installing the lag screws.
Note: Tighten all bolts from Step 28 series before installing lag screws.
A: Attach 1 (LS9) 5/16 x 4-3/4" Lag Screw (with flat washer) into each (272) SW Post, as shown in fig. 30.1.
B: Attach 1 (LS9) 5/16 x 4-3/4" Lag Screw (with flat washer) into remaining hole of the Heavy G-Bracket into
(260) Engineered SW Beam. (fig. 30.1)
Fig. 30.1
272
LS9
5/16" Flat
Washer
272
260
5/16" Flat
Washer
Hardware
3 x
5/16 x 4-3/4" Lag Screw
LS9
(5/16" flat washer)
83
Heavy
G-Bracket
LS9

Advertisement

loading

This manual is also suitable for:

F23175