Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 101

Advertisement

Step 45: Attach SL Support to Ground Back
A: Insert TNR2 Post Mount on (400) SL Support and attach with 2 (PB2) 1/4 x 1-1/4" Pan Bolts (with lock
washer and t-nut). Keep these bolts loose. (fig. 45.1 and 45.2)
B: Use (400) SL Support as a guide to judge the proper bolt location, remove the bottom pan bolt and nut.
The bolt will no longer be needed, but keep the lock nut. (fig. 45.2)
C: Attach the top of the TNR2 Post Mount to TNR2 Slide Clamp Ring using 1 (PB2) 1/4 x 1-1/4" Pan Bolt
(with the previously removed lock nut). (fig. 45.2)
Fig. 45.1
400
PB2
Remove PB1 (1/4 x 3/4"
Pan Bolt first then install
PB2 (1/4 x 1-1/4" Pan Bolt
with previously removed
lock nut)
Hardware
3 x
1/4 x 1-1/4" Pan Bolt
PB2
2 - (1/4" lock washer & 1/4" t-nut)
1 - (1/4" lock nut - previously removed)
101
TNR2 Post
Fig. 45.2
Mount
1/4" Lock
Washer
400
PB2
1/4" T-Nut
Other Parts
1 x TNR2 Post Mount

Advertisement

loading

This manual is also suitable for:

F23175