Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 79

Advertisement

Step 27: Swing Beam Assembly
A: Attach 6 Heavy Duty Swing Hangers to (260) Engineered SW Beam using 2 (G13) 5/16 x 6-1/8" Hex Bolt
(with 2 flat washers, plastic formed washer and lock nut) per swing hanger, as shown in fig. 27.1.
B: Attach 1 Quick Clip to each Heavy Duty Swing Hanger. (fig. 27.2)
Fig. 27.2
Quick Clip
C: Install 4 (WB7) 5/16 x 3" Wafer Bolts (with flat washer and t-nut) in (260) Engineered SW Beam, as shown in
fig. 27.3 and 27.4. A Wafer Bolt does not get installed on the Swing Side of the beam.
IMPORTANT! MAKE SURE ALL 4 BOLTS ARE ATTACHED. THEY WILL MINIMIZE CHECKING OF WOOD.
Fort Side
Fig. 27.4
5/16" Flat
Washer
5/16"
T-Nut
Wood Parts
1 x
Engineered SW Beam FSC 3 x 5-1/4 x 110"
260
Fig. 27.1
Heavy Duty
Swing Hanger
Fig. 27.3
WB7
9-3/4"
12 x
4 x
Plastic
Formed
Washer
5/16"
5/16" Flat
Lock Nut
Washer
260
Hardware
5/16 x 6-1/8" Hex Bolt
G13
(5/16" flat washer x 2, 5/16" lock nut
& plastic formed washer)
5/16 x 3" Wafer Bolt
WB7
(5/16" flat washer, 5/16" t-nut)
79
G13
5/16" Flat
Washer
260
Does not get
Wafer Bolt
Swing Side
Other Parts
6 x Heavy Duty Swing Hangers
6 x Quick Clips

Advertisement

loading

This manual is also suitable for:

F23175