Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 39

Advertisement

Step 10: Slide Top Assembly
Part 1
A: Loosely attach (120) SL Top Left to 1 (122) Post and (123) SL Top Right to another (122) Post with 1 (G1)
5/16 x 1-1/2" Hex Bolt (with lock washer, flat washer and t-nut) per post. (fig. 10.1 and 10.2)
B: Loosely attach 1 (121) Short Joist to the bottom of both (122) Posts with 1 (G8) 5/16 x 2" Hex Bolt (with lock
washer, flat washer and t-nut) per post. (fig. 10.1 and 10.2)
Note: Make sure (120) SL Top Left, (123) SL Top Right and (121) Short Joists are level to the top and
bottom of (122) Posts.
G1
Right Side
Post Assembly
G8
Wood Parts
1 x
SL Top Left FSC 5/4 x 5 x 9-3/4"
120
121
2 x
Short Joist FSC 2 x 4 x 5-1/4"
2 x
122
Post FSC 5/4 x 4 x 31-7/8"
1 x
SL Top Right FSC 5/4 x 5 x 6-1/2"
123
123
Fig. 10.1
122
121
2 x
2 x
120
5/16" T-Nut
5/16" T-Nut
Hardware
5/16 x 1-1/2" Hex Bolt (5/16" lock washer, 5/16" flat washer, 5/16" t-nut)
G1
5/16 x 2" Hex Bolt (5/16" lock washer, 5/16" flat washer, 5/16" t-nut)
G8
39
Fig. 10.2
5/16" Flat
Washer
G1
5/16" Lock
Washer
Left Side
Post Assembly
122
121
5/16" Flat
Washer
G8
5/16" Lock
Washer

Advertisement

loading

This manual is also suitable for:

F23175