Step 41: Attach Flange Assembly to Fort
A: With a helper place the Flange Assembly flush to the Crowsnest on the fort as shown in fig. 41.1, then
pre-drill 1/8" pilot holes in the bottom 4 mounting locations on (344) Crowsnest Gap (approximate spots where
circles are on figure), making sure the pre-drilled holes are a minimum of 1" deep.
B: Attach Flange Assembly to the Crowsnest through (344) Crowsnest Gap and into (332) Crowsnest Front
using 4 (S7) #12 x 2" Pan Screws (with #12 Screw Bezel) in the pre-drilled holes. (fig. 41.1 and 41.2) Make
sure the flat surfaces of the Flange Assembly are flush to the Crowsnest as shown in fig. 41.5.
C: Attach the Flange Assembly flush to (340) Crowsnest SL Top using 4 (S6) #12 x 1" Pan Screws (with #12
Screw Bezel) as shown in fig. 41.1 and 41.3 and to both (348) Crowsnest Faces using 5 (S6) #12 x 1" Pan
Screw per board. (fig. 41.1 and 41.4)
Fig. 41.3
Fig. 41.1
S6
Flange
Assembly
S6
Sides
Fig. 41.4
348
(hidden)
Top
#12 Screw
Bezel
(hidden)
340
Inside View
S7
Fig. 41.2
Bottom
348
(hidden)
344
332
#12 Screw
Bezel
Hardware
14 x
#12 x 1" Pan Screw
S6
4 x
#12 x 2" Pan Screw
S7
8 x
#12 Screw Bezel
95
Fig. 41.6
348
Outside View
Fig. 41.5
340
348
Top of slide flush
to 340 Crowsnest
SL Top
Bottom of
slide flush
with deck