Download Print this page

KidKraft Grand Valley Retreat Installation And Operating Instructions Manual page 41

Advertisement

Step 10: Slide Top Assembly
Part 3
E: Make sure (120) SL Top Left is flush to the inside edge of the panel support on (043) SW Side Panel and
(123) SL Top Right is flush to the inside edge of (040) Wall Cafe Window Panel and both boards are level then
attach to (043) SW Side Panel and (040) Cafe Wall Window Panel with 2 (S15) #8 x 1-3/4" Wood Screws per
board. (fig. 10.5 and 10.6)
F: Tighten bolts on each Post Assembly.
Fig. 10.6
040
123
040
Flush
S15
120
4 x
Hardware
#8 x 1-3/4" Wood Screw
S15
41
Fig. 10.5
043
043

Advertisement

loading

This manual is also suitable for:

F23175