Motorola Horizonmacro outdoor Installation/Configuration Manual page 57

Table of Contents

Advertisement

GSM-204-423
Installation overview
Introduction to
installation
This chapter provides the information required to install the Horizon macro
outdoor cabinet and its internal and external interfaces.
Before starting an installation, ensure the site has been prepared according to
the description summarised in Preparation overview in Chapter 2, and the
site-specific documentation.
Installation
sections
Installing cabinets comprises the sections shown in Table 3-1.
Equipment delivery
and unpacking
Fitting outdoor
cabinet onto base
Earthing and transient
protection
Connecting the
internal batteries
Installing power and
earth cabling
Connecting input
power
Connecting antennas
and RF configurations
Interface cabling
E1/T1 line
testing
If an E1/T1 line has been provided, contact the local MSC and, at the earliest
opportunity, arrange to test the line back to the MSC.
31st Oct 01
CAUTION
Ensure that all site associated equipment is completely
installed before commissioning the cabinet for operation.
NOTE
Some site equipment may not be produced by Motorola,
including battery chargers, power supplies, and antennas.
Refer to site-specific documentation and non-Motorola
vendor instructions.
Table 3-1 Installation sections in this chapter
Section
Information on delivery packaging, and how
to unpack the equipment.
Provides procedure for attaching cabinet to
prepared plinth.
Describes site earthing procedures and
cabinet internal earths.
Describes the procedure for connecting up
the internal batteries.
Describes the power supply earthing
requirements.
Describes the correct sequence for power
connection.
Describes setting up antenna connections
and sample RF configurations.
Describes cabling to the interface panel.
Installation & Configuration: Horizon macro outdoor
68P02902W03-A
CONTROLLED INTRODUCTION
Installation overview
Description
Inst. 3–1

Advertisement

Table of Contents
loading

Table of Contents