GSM-204-423
Introduction to cable shroud installation
Preparing to
install the cable
shroud
The cable shroud is installed after the BTS cabinet is in position. If the shroud is
to be used for cable concealment between two BTS cabinets or a BTS cabinet
and an auxiliary equipment housing, 182 mm space must be allowed between
templates, (see Site requirements and considerations in Chapter 2 of this
category). This will ensure the correct spacing between the cabinets for the
shroud. A shroud template is provided, with the shroud, as an aid to determine
the space required.
Considerations
when installing
the cable
shroud
The cable shroud is normally installed on the right side of the BTS cabinet. It
can be installed on the left side of the cabinet, if the cabinet has been fitted with
the earth/connector plate mounted on the left side. The cable shroud can also
be installed between adjacent BTS cabinets or between a BTS cabinet and an
auxiliary equipment housing (AEH).
Only the procedures for attaching the cable shroud to the right side of the
cabinet, and between cabinets, are described in this chapter. The procedures
for attaching the cable shroud to the left side of the cabinet are the same, but
mirrored. The side panels of the shroud can be attached to either side of the
shroud frame to allow this.
31st Oct 01
Installation & Configuration: Horizon macro outdoor
68P02902W03-A
CONTROLLED INTRODUCTION
Introduction to cable shroud installation
Inst. 4–1

Advertisement

Table of Contents
loading

Table of Contents