Maintenance - Thermo Scientific RadEye AB100 Operating Instructions Manual

Multi-purpose survey meter
Table of Contents

Advertisement

10. Maintenance

Replacing the window foil
The foils cover the foil frame. After removing of the protective
grid (2 ea. screws), the outer foil frame (single mylar foil) is with-
in reach. After dismantling the cover sheet and the pressure frame
(10 ea. screws), the outer foil frame can be easily taken out and
changed.
In order to change the second foil frame, the sealing frame has to
be removed. After removal, the defective foil frame has to be
carefully unfixed from the scintillator.
RadEye AB100
DB-070 E
10-1
Pi/Ff 04.05.2021

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Db-070 e

Table of Contents