Remove The Cabinet From The Pallet; Transport The Evse On The Site; General Transport Procedure - ABB Terra HP Generation 4 CE Ionity Installation Manual

Table of Contents

Advertisement

5.5

Remove the cabinet from the pallet

Preliminary requirements
Procedure
1. Remove the fasteners (A).
2. Discard the fasteners and the pallet.
Refer to section 2.9.
5.6

Transport the EVSE on the site

5.6.1

General transport procedure

Preliminary requirements
6AGA000032-0115-EN | 004
Open spanner
The cabinets are unpacked. Refer to section 5.4.
Note: The charge post is delivered horizontally or vertically.
Caution: Do not tilt the power cabinet to the horizontal position. In the
horizontal position, the power cabinet breaks.
Inspection and transport
A
37

Advertisement

Table of Contents
loading

Table of Contents