Kpi Energy / Heat Recovery Unit; Accessories Supplied With The Unit; Unit Installation - Hitachi RCI Service Manual

Indoor units system free series & complementary systems
Table of Contents

Advertisement

2 Unit installation

2.9 KPI energy / heat recovery unit

2.9.1 Accessories supplied with the unit

Check that the following accessories are supplied with the unit.
N O T E
Please contact your HITACHI distributor if any of the accessories has not been supplied with the unit.
Accessory
Duct adapter
Set screw (M4 x 8)
Adapter gasket
Anti-vibration rubber, nut,
washer and spring washer

2.9.2 Unit installation

Initial checks
KPI-(252-802)(E/H)2E energy / heat recovery unit
1. Unit inspection and maintenance access.
KPI-(1002-2002)(E/H) energy / heat recovery unit
1. Unit inspection and maintenance access.
61
SMGB0063 rev. 1 - 10/2010
Appearance
Quantity
Purpose
4
For duct connection.
24
4
For hose connection.
4, 4, 4, 8
For unit installation.
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

RcimRcdRpcRpiRpimRpk ... Show all

Table of Contents