Operation Panel; Operation Panel Outline - EBARA EV-SA20 Instruction Manual

Multi-stage dry vacuum pump
Table of Contents

Advertisement

P.36

4. Operation Panel

4.1 Operation Panel Outline

Running status can be checked by Data screen on the operation panel.
Fig.4.1, Table 4.1 and 4.2 show the Operation Panel, Push button switch, and LED Lamp.
Data screen
RUN LED
NOTE
Do not open the connector cover. The connector is only for maintenance. Do not
connect another equipment with cable; such as LAN cable that has been on the
market. The connection may cause failure of the equipment or the pump.
NOTE
When monitoring the operation panel, take care not to become unusual postures.
PM10U
LO/RE LED
Push button switches
Fig. 4.1 Operation Panel
LED Lamps
Connector only for
maintenance
EBARA
CORPORATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ev-sa20-2Ev-sa20-3

Table of Contents