Dodge ZB 2005 Service Manual page 933

Table of Contents

Advertisement

23 - 22
CONVERTIBLE TOP
HINGE - SIDEARM/LINKAGE ASSEMBLY (Continued)
Fig. 15 FOLDING TOP MOUNTING BRACKET
1 - FOLDING TOP ASSEMBLY
2 - TOP STACK WELL CARPET
3 - BODY ASSEMBLY
4 - FOLDING TOP MOUNTING BRACKET
Fig. 16 SIDEARM/LINKAGE ATTACHMENTS
1 - SIDEARM/LINKAGE ASSEMBLY
2 - SUPPORT BRACKET
3 - LINKAGE BOLTS
4 - ALIGNMENT HOLES
(5) Tighten the bolts to 12 N·m (9 ft. lbs.).
(6) Position the tension cable through the cover
assembly and replace the rivet.
(7) Position the cover assembly side panel at the
door opening and install new rivets attaching it to
the sidearm/linkage.
(8) Tighten the rear rail bolts to 18 N·m (13 ft.
lbs.).
(9) Tighten the balance link shoulder bolts to 20
N·m (15 ft. lbs.).
(10) Install the center/3 bolts and tighten the bolts
to 5 N·m (45 in. lbs.).
(11) Install the rear/4 bolts and tighten the bolts to
6 N·m (55 in. lbs.).
(12) Install the bulkhead trim panel. (Refer to 23 -
BODY/INTERIOR/BULKHEAD
INSTALLATION)
ZB
TRIM
PANEL
-

Advertisement

Table of Contents
loading

Table of Contents