Rexroth Indramat ECODRIVE03 Series Project Planning Manual page 80

Drive controllers
Table of Contents

Advertisement

4-48
ECODRIVE03 DKC**.040, DKC**.100, DKC**.200
Connection
Loadability of the connection
Switching states
customerservice@hyperdynesystems.com
Ready to operate contact Bb
device-external
Bb:
ready for operation
Fig. 4-56:
Connections for ready to operate contact
m
a
. x
S
w
c t i
h
n i
g
o v
a t l
Bb:
m
a
. x
S
w
c t i
h
n i
g
c
r u
m
x a
c .
o
t n
n i
u
o
s u
c
M
i n i
m
u
m
c
o
t n
c a
l t
Guaranteed number of switching operations
at max. time constant of load < 50 ms:
The Bb contacts opens:
Bb:
if control voltage for DKC is not applied
if 24 volts not present at the emergency stop input when the E-stop
function is activated (depends on parameterization, see function
description).
With an error in the drive (depends on parameterization, see rmware
functional description: "Power o on error").
How to use the contact, see page 11-2 "Control Circuits for the Mains
Connection"
Damage possible if Bb contact not connected!
The ready to operate contact Bb acknowledges the drive
is ready for mains voltage.
WARNING
|
(479) 422-0390
ECODRIVE03 Drive Controllers
device-internal
X1
1
2
3
4
5
6
7
Bb
8
Bb
g
: e
e r
: t n
r u
e r
: t n
a o
: d
Integrate Bb contact as per "Control Circuits for the
Mains Connection".
The evaluation of the Bb contact by a PLC may not
cause any operating delay of more than 10 ms.
AP5122F1.FH7
D
C
4
0
V
D
C
1
A
D
C
1
A
1
0
m
A
250,000

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents