All Models - Supply Duct Requirements/Connection; All Models - On-Site Assembly; All Models - Air Filter Installation - Seeley Climate Wizard CW-80 Installation & Operation Manual

Table of Contents

Advertisement

INSTALLATION Cont.
All models - Supply Duct Requirements/
Connection
Supply air exits the CW-80, CW-80S from the end and
the CW-80T, CW-80T-TWIN from the top. Ducting is to
run from the cooler outlet to customer inlet.
Duct dimensions are be optimised to minimise back
pressure which will maximise the cooler's efficiency.
All ducting direction changes must utilise a generous
radial turn with internal air directors to minimise
turbulence and maximise efficiency. Ducting is to be
suitably insulated to minimise temperature losses.
Vibration absorbing flexible connections are
recommended for all duct connections at the cooler end
for any ducts that are attached to the building structure.
All ducts attached to the flexible connection must be
independently supported.

All models - On-Site Assembly

The cooler will require a degree of on-site assembly
depending on the model and the selected transport
method. The following view shows the CW-80 cooler in
its most disassembled state.

All models - Air Filter Installation

Once the cooler is correctly positioned, it is
recommended that the Air Filter assemblies are fitted to
protect the cores from damage.
Remove the Air Filter assemblies from their packaging
and fit to the cooler.
ILL2042-A
Position top flange of the Filter Housing behind the top
mounting plate and push upwards, as in the illustration
below.
ILL2211-A
ILL2211-A
INSTALLATION, OPERATION & MAINTENANCE MANUAL 866600CE-B | 13
ILL2030-A
TOP
MOUNTING
PLATE
TOP
FLANGE
FILTER
HOUSING
ILL2212-A
ILL2212-A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents