INSTALLATION

MOUNTING/SUPPORT

A CW-P15 can be mounted on a flat horizontal surface, or
nested into a rectangular roof frame
Flat Mounting
Use 90mm SHS Steel or similar as securing tracks for cooler,
as seen in following diagram.
Frame Mounting
50 x 50 x 3mm (2" x 2" x 1/8") RHS, Galvanized or Painted
steel. See dimensions on page 6 to design frame. Alternatively,
an adjustable Roofstand is available for order via Seeley to suit
cooler size and accommodating 0 to 10º degree roof pitches.
see parts list, page 7.
CW-P15: 0-10º - P/No. 134246
Use a quality spirit level of 1.2m minimum length to ensure the
mounting frame is level in all directions.

VIBRATION ISOLATION

Secure the cooler to the support frame by screwing the
mounting bracket in 2 places both sides using galvanized M8
bolts, nuts & washers, see previous picture.
Lifting brackets can be used as tie-down points if required.

DUCT CONNECTIONS

Flexible connections are required for all duct connections to the
cooler, for any ducts that are attached to the building structure.
All duct-work attached to the flexible connection must be
independently supported.
For duct attachment dimensions see page 3: "Cooler
Views".
Best performance is achieved from duct systems with minimal
restriction.

INLET AIR FILTER ASSEMBLY

Climate Wizard coolers SHOULD NEVER BE OPERATED
WITHOUT DUST FILTERS. Only use approved dust filters.
ILL3516-A
ILL3516-A
SEELEY INTERNATIONAL - INSTALLATION MANUAL CW-P15 859740-G |
FLEXIBLE
CONNECTION TO
COOLER TO BE
LOCATED HERE
ILL2266-A
10