Cw-80T-Twin: Positioning - Seeley Climate Wizard CW-80 Installation & Operation Manual

Table of Contents

Advertisement

INSTALLATION Cont.
CW-80T-TWIN
CW-80T-TWIN
8.0m
CONCRETE SLAB
1.0m
Provision must be made for access to electricity, BMS
controls, water supply and drains.

CW-80T-TWIN: Positioning

Position CW-80T's central to each other with the non-
operator ends pushed hard up together.
TOP JOINER
PLATE
12 |
CW-80 Container Cooler 866600CE-B
6.0m
1.0m
BOTTOM
JOINER PLATE
(TYP 2 PLACES)
Once CW-80T's are positioned correctly bolt both bottom
joiner plates into position using M8 screw assembly B.
There is one plate on either side.
0.95m
2.3m
4.2m
0.95m
ILL2365-A
ILL2365-A
Bolt top joiner plate into position using M8 screw
assembly B.
ILL2292-A
Where the 2 CW's come together, a silicon bead can be
applied to the vertical and horizontal stainless steel joints
to produce a neat joint which will prevent debris build up
between the CW-80T's.
ILL2293-A
BOTTOM JOINER PLATE
(BOTH SIDES)
TOP JOINER
PLATE
ILL2301-A
ILL2294-A
ILL2294-A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents