Some Points To Consider; Other Important Requirements - Seeley Climate Wizard CW-80 Installation & Operation Manual

Table of Contents

Advertisement

SOME POINTS TO CONSIDER

What is the best and safest access to the
roof and working areas?
If a worker is alone, who knows they are
there and if they get into difficulty, how can
they summon help?
(Call someone on the ground? Mobile
phone? etc.)
What condition is the roof in? Should the
trusses, underside or surface be checked?
Does the worker have appropriate foot
wear? (Flat sole jogger type is advisable)
Are all power cables / extension leads safe
and appropriately rated?
Are all ladders, tools and equipment suitable
in good condition?
Where ladders are to be used, is there a
firm, stable base for them to stand on?
Can they be tied or secured in some way
at the top? Is the top of the ladder clear of
electricity supply cables?
Is there a roof anchor to attach a harness
and lanyard to? If so, instruction should be
issued for the use of an approved harness
or only suitably trained people used.
Are all tools and materials being used,
prevented from slipping and falling onto a
person at ground level? Is the area below
the work area suitably protected to prevent
persons walking in this area?
Does the work schedule take into account
weather conditions, allowing for work to be
suspended in high winds, thunder storms/
lightning or other types of weather giving
wet, slippery surfaces?
Is there an on-going safety check system of
harnesses, ropes, ladders and access/lifting
equipment and where they exist on roofs,
anchor points before the commencement of
work?
Is there a system which prevents employees
from working on roofs if they are unwell or
under the influence of drugs or alcohol?
Are there any special conditions to consider
i.e. excessive roof pitch, limited ground
area, fragile roof, electrical power lines?

OTHER IMPORTANT REQUIREMENTS

Never force parts to fit because all parts are
designed to fit together easily without undue
force.
Never drill holes in the tank of the cooler.
Check the proposed cooler location, to
ensure that it is structurally capable of
supporting the weight of the cooler, or
provide an adequate alternate load bearing
structure.
Ensure the installation complies with all
local and national regulations with regards
to electrical, plumbing and bushfire
construction requirements.
INSTALLATION, OPERATION & MAINTENANCE MANUAL 866600CE-B | 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents