Residential Maintenance Schedule; Requirements For All Coolers (Every 2 Years) - Seeley LCQ Owner's Manual

Evaporative cooler
Hide thumbs Also See for LCQ:
Table of Contents

Advertisement

RESIDENTIAL MAINTENANCE SCHEDULE

REQUIREMENTS FOR ALL COOLERS (EVERY 2 YEARS)

Maintenance Schedule servicing should be performed before the summer season. We require
that the following components and the operation thereof, be serviced every 2 years for residential
purposes.
COMPONENT CHECKS
Service Item
Pad Frames
Tank
Chillcel Pads
Pad Pins & Washers
Water Distributors & Hoses
Pump
Drain Valve (if fitted)
Bleed Funnel (if fitted)
Solenoid
Probe
Float Valve
Motor
Fan
Electronics Box & Cables
General Product Condition
|
6
Action
Check
Clean (if required)
Check
Clean (if required)
Check
Clean (if required)
Replace (if required)
Check / Adjust
Clean (if required)
Check / Adjust
Clean (if required)
Clean Filter
Check Operation
Replace (if required)
Clean
Check Operation / Adjust
Replace (if required)
Clean
Check Operation
Check Operation
Replace (if required)
Clean
Check Operation
Replace (if required)
Check Operation / Adjust
Replace (if required)
Check Operation
Replace (if required)
Check / Adjust
Replace (if required)
Check / Adjust
Replace (if required)
Check condition and correct fitting of all
components. Adjust / replace as required.
Service Year
1
2
3
4
5
6
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

LcsLcqiBmqCpqTbqTbs ... Show all

Table of Contents