Residential Maintenance Schedule; Requirements For All Coolers (Every 2 Years) - Seeley Breezair EXT Installation & Operation Manual

Evaporative coolers
Table of Contents

Advertisement

MAINTENANCE

RESIDENTIAL MAINTENANCE SCHEDULE

REQUIREMENTS FOR ALL COOLERS (EVERY 2 YEARS)

Maintenance Schedule servicing should be performed before the summer season. We require that the following components and the
operation thereof, be inspected after the first year of use, and serviced every 2 years for residential purpose.
COMPONENT CHECKS
Service Item
Pad Frames
Tank
Chillcel Pads
Pad Pins & Washers
Water Distributors & Hoses
Pump
Drain Valve (if fitted)
Bleed Funnel (if fitted)
Solenoid
Probe
Float Valve
Motor
Fan
Electronics Box & Cables
General Product Condition
|
16
Action
Check
Clean (if required)
Check
Clean (if required)
Check
Clean (if required)
Replace (if required)
Check / Adjust
Clean (if required)
Check / Adjust
Clean (if required)
Clean Filter
Check Operation
Replace (if required)
Clean
Check Operation / Adjust
Replace (if required)
Clean
Check Operation
Check Operation
Replace (if required)
Clean
Check Operation
Replace (if required)
Check Operation / Adjust
Replace (if required)
Check Operation
Replace (if required)
Check / Adjust
Replace (if required)
Check / Adjust
Replace (if required)
Check condition and correct fitting of all components.
Adjust / replace as required.
Service Year
1
2
3
4
5
6
7

Advertisement

Table of Contents
loading

Table of Contents