Sharp V-1 General & Electrics Manual page 95

Vertical mill
Table of Contents

Advertisement

SHARP
7.11.2 WEEKLY MAINTENANCE
1.
Ensure all the pumps work well.
2.
Ensure the air power drawbar system (optional ) could be operated normally.
7.11.3 MONTHLY MAINTENANCE
1.
Check gibs on the bed and cross slide. If necessary, adjust gibs according to the
instructions in "GIB ADJUSTMENT" .
2.
Clean the cutting fluid pipes and lubrication oil pipes.
3.
Clean up the cutting oil tank, and then fill up the tank with recommended oil.
4.
Check ball screws and clean them.
5.
Ensure any nuts and screws are locked.
7.11.4 HALF-YEARLY MAINTENANCE
1.
Ensure the spindle run out and bearing clearance are within the specified precision's
2.
Ensure there are no loose nuts and screws.
3.
Ensure all the electrical parts, such as connectors, switches, cables, are in normal
service conditions.
4.
Check out all the insulation resistors. Ensure to keep a record.
5.
Ensure the tool exchanger do not interfere with the spindle.
V-1 KNEE MILL GENERAL MANUAL
CH7-16
KRDM24C0 V4.0S

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents