2.1 SHIPPING AND HANDLING

This mill is composed of bed base, variable speed head or, saddle working table,
operation panel, hydraulic system, lubrication system and electrical cabinet.
The shipping and handling equipment used should be able to lift a gross weight of 4 tons
at least. Due to sizes of the machine, it is recommended to lift this machine with crane and
use only the sling frame provided by our local agent or us. Nevertheless, read the following
section carefully before handling the package.
2.1.1 DANGERS
Ensure the shipping and handling equipment can handle a gross weight of 4 tons at least.
If can't make certain of the load capacity of the handling equipment, please contact with the
manufacture which provide the handling equipment, be ensure the load capacity. Don't try to
do handling under unknown the load capacity of the handling equipment otherwise
might happen accident that damaged handling equipment and machine, even person
injury.
Use only the sling frame provided by us to lift this machine. Uses of any other sling frame
are prohibited because might happen accident that damaged handling equipment and
machine even person injury. Ensure the wire ropes can withstand at least a gross weught of 4
tons if they are used with the lifting equipment to lift the machinery package.
2.1.2 WARNINGS
1.
Ensure the lifted machinery package is balanced before starting to move it.
2.
Abrupt changes in lifting & lowering speed might cause unexpected damage on the
machinery package and are therefore prohibited.
3.
No people or vehicle is allowed to stay under the lifted package.
4.
Make sure nobody is around the working area before starting to lift the package.
Clinging onto the sling frame or wire ropes by any person is very dangerous and is
definitely prohibited.