4.6.18 LOCK QUILL
If operators don't use quill feed, he can use the quill lock lever 16 to clamp the quill. It is
necessary to be clamped when operators do cutting. Ensure to use adequately clamping
pressure to set it, otherwise excessive pressure will broke the clamping parts.

4.7 BREAK-UP

Ensure to turn off the emergency stop on the operating panel and the circuit breaker of
the main power whenever the machining job is done and the machine is left unattended.

4.8 FINISH

Ensure to turn off the machine power when finish work, the procedures below must be
following:
Push down the emergency stop button ( Switch off the main power switch of the
machine (optional) ( Turn off the factory's main power supply.
4.9 INSPECTION AFTER FINISH
1.
Ensure all the machine parts are in good conditions.
2.
Check the centralized lubrication system. Fill up or refill the oil if necessary.
3.
Ensure there is no leakage occurred in the pipe lines.
4.
Ensure all screws are secured properly.
5.
Ensure all the gauges and indication meters are in normal conditions.
6.
Clean up the cutting chips. Keep the machine and working area clean and orderly.