V-1 KNEE MILL GENERAL MANUAL

3.1 PREPARATION

Ensure the site space and the path width is large enough to install and transport the
whole machine at least 30 working days before the arrival of this machine. If short of space,
please inform local agent or us as soon as possible, we will provide a suggestion and
information service for you. Please clear the space in advance for the machine to move in and
install.
WARNING !!!
Ensure to reserve space for optional equipment. Please contact local agent or us
if you have any problem in installing this machine.