3.5 LEVELING THE MACHINE

3.5.1 ADJUST THE MACHINE
1.
Place the temporary foundation pads or leveling blocks on the foundation.
2.
In the first case, insert the L-shape fixing stud through the pad and foundation bolt,
then fasten the fixing stud with the nut.
3.
Adjust foundation bolts until the space between the base bed and foundation pad is
5 mm (approx.) long.
4.
Place two horizontal levels on the working table orthogonal, level the machine until
differences between levels in both directions are within 0.05mm/m.
5.
Fasten the setup nuts for the foundation pads and L shape-fixing studs.
6.
Fill up the foundation with concrete.
7.
Wait for about seven days until the concrete is dry and solid.
8.
Place two 200mm long horizontal levels on the working table orthogonal, level the
machine until difference between levels in both directions is within 0.02 mm/m.
V-1 KNEE MILL GENERAL MANUAL
CH3-12
KRDM24C0 V4.0S