Configuration Steps For A Siemens Simatic S7 Control - Leuze electronic AMS 348i Manual

Optical laser measurement system
Table of Contents

Advertisement

9.8.3
Starting the device
 Connect the supply voltage; the AMS
main menu appears in the display:
+ 87.000 m
This section describes how the AMS
PROFINET.
9.8.4

Configuration steps for a Siemens Simatic S7 control

The following steps are necessary for commissioning with a Siemens S7 control:
1.
Preparing the control system (S7 PLC)
2.
Installing the GSD file
3.
Hardware configuration of the S7 PLC
4.
Transfer of the PROFINET configuration to the IO Controller (S7 PLC)
5.
Device naming
• Configuration of the device name
• Device naming
• Assigning the device names to the configured IO devices(see figure 9.9)
• Assignment of MAC address - IP address -individual device name ((see figure 9.15))
6.
Check device name
9.8.4.5 Step 1 – Preparing the control system (S7 PLC)
The first step involves the assignment of an IP address to the IO Controller (PLC - S7) and
the preparation of the control for consistent data transmission.
Notice!
If an S7 control is used, you need to ensure that Simatic-Manager Version 5.4 + service pack
5 (V5.4+SP5) or higher is used.
9.8.4.6 Step 2 – Installation of the GSD file
For the subsequent configuration of the IO devices, e.g., AMS 348i, the corresponding GSD
file must be loaded first.
General information on the GSD file
The term GSD stands for the textual description of a PROFINET device model.
For the description of the more complex PROFINET device model, the XML-based GSDML
(Generic Station Description Markup Language) was introduced.
In the following, the terms "GSD" or "GSD file" always refer to the GSDML-based format.
Leuze electronic
348i
Link0
Link1
348i
AMS
348i
PROFINET interface
boots and the Status and measurement data
is configured in a Siemens Simatic S7 for
56

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents