Charging The Prosthesis Battery; Display Of The Current Charge Level; Display Of Battery Charge Level Without Additional Devices - Otto Bock Genium Series Instructions For Use Manual

Bionic prosthetic system
Table of Contents

Advertisement

Available languages

Available languages

Charging the battery
3) Plug the power supply unit into the outlet (see fig. 3).
→ The green LED on the back of the power supply lights up.
→ The LED ring (status indicator) on the rear of the charger lights up green to indicate the correct connection
to the power supply.
→ If the green LED on the power supply and the LED ring on the battery charger do not light up, there is an error
(see Page 107).

6.2 Charging the prosthesis battery

INFORMATION
When the Protective Cover is installed, the battery charger cable has to point to the upper closure. A correct knee
joint charging process is only ensured with this alignment.

6.3 Display of the current charge level

6.3.1 Display of battery charge level without additional devices

INFORMATION
The charge level cannot be displayed during the charging process, e.g. by turning the prosthesis over. The
product is in charging mode.
Beep signal
5x short
4x short
3x short
2x short
1x short
INFORMATION
If the Volume parameter is set to '0' in the Cockpit app (see Page 93) or if mute mode (silent mode) is activated,
there are no beep signals.
80
1) Connect the inductive charger to the receiver of the charging unit on the rear of
the product. The charger is held in place by a magnet.
→ The LED ring on the rear of the charger pulsates purple (4-second cycle).
→ If the LED ring lights up in a different colour, this indicates an error (see
Page 107).
2) The charging process starts.
→ Once the product battery is fully charged, all LEDs on the side of the battery
charger light up.
3) After the charging process is complete, hold the prosthesis still and remove the
inductive charger from the receiver.
→ A self-test is performed. The joint is operational only after corresponding
feedback (see Page 110).
1) Turn the prosthesis by 180° (the sole of the foot must face up).
2) Hold still for 2 seconds and wait for beep signals.
Battery charge level
more than 80%
60% to 80%
40% to 60%
20% to 40%
less than 20%

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Genium 3b1/3b1-st3b1-2/3b1-2-st

Table of Contents