Rear Output Shaft Assembly Disassembly And Reassembly - Suzuki GRAND VITARA JB416 Service Manual

Hide thumbs Also See for GRAND VITARA JB416:
Table of Contents

Advertisement

3C-73 Transfer: Motor-Shift Type (Transfer with Shift Actuator)
Rear Output Shaft Assembly Disassembly and
Reassembly
Disassembly
1) Remove snap ring (1) from rear output shaft (2).
1
2) Remove bearing (1) from rear output shaft (2) using
bearing puller (3) and press (4).
4
3
S5JB0E3316015
2
I5JB0A331075-01
1
2
I5JB0A331076-01
Reassembly
1) Clean all components thoroughly, inspect them for
any abnormality and replace with new ones as
necessary.
2) To ensure lubrication of rear output shaft (1), air blow
oil holes (2) and make sure that they are free from
any obstruction.
2
3) Press-fit bearing (1) to rear output shaft using
special tools and press.
Special tool
(A): 09913–85210
(B): 09940–54910
(A)
(B)
4) Install snap ring (1) to rear output shaft (2).
1
1
I5JB0A331077-01
1
2
I5JB0A331078-01
2
I5JB0A331075-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Grand vitara jb420

Table of Contents