UPS5000-E-(50 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
Figure 3-11 Leveling and fixing bolts
(1) Anchor bolt
----End
3.2.2 Installing a Tail Frame
Context
A tail frame is used to increase the depth of a UPS to 1200 mm, and can also be used to route
cables in and out from the bottom. Its BOM number is 21242025.
Issue 09 (2019-12-20)
(2) Fixing bolt
Copyright © Huawei Technologies Co., Ltd.
3 Installation
(3) Level
67