Huawei UPS5000-E Series User Manual page 6

Integrated ups, 50/125 kva
Hide thumbs Also See for UPS5000-E Series:
Table of Contents

Advertisement

UPS5000-E-(50 kVA-125 kVA)
User Manual (Integrated UPS 3.0)
2.4.2 ATS Controller...................................................................................................................................................38
2.4.3 ATS (8D) Operation Description ........................................................................................................................43
2.5.1 ATS Monitoring Module ....................................................................................................................................48
2.5.2 ATS III Segment Manual Operation Description .................................................................................................49
2.6 Optional Components ...........................................................................................................................................52
3 Installation .............................................................................................................................. 53
3.1 Installation Preparations .......................................................................................................................................53
3.1.1 Tools and Instruments ........................................................................................................................................53
3.1.2 Site ....................................................................................................................................................................55
3.1.2.1 UPS Weight and Dimensions ...........................................................................................................................55
3.1.2.2 Installation Environment .................................................................................................................................57
3.1.2.3 Installation Clearances ....................................................................................................................................57
3.1.3 Preparing Power Cables .....................................................................................................................................57
3.1.4 Unpacking and Checking ...................................................................................................................................60
3.2 Installing a Single UPS .........................................................................................................................................63
3.2.1 Installing the Cabinet .........................................................................................................................................63
3.2.2 Installing a Tail Frame .......................................................................................................................................67
3.2.3 Installing Batteries .............................................................................................................................................74
3.2.4 Routing at the Top .............................................................................................................................................75
3.2.4.1 Routing Cables ...............................................................................................................................................75
3.2.4.2 Connecting a Ground Cable ............................................................................................................................78
3.2.4.3 Connecting AC Input Power Cables ................................................................................................................79
3.2.4.4 Connecting AC Output Power Cables ..............................................................................................................82
3.2.4.5 Connecting Battery Cables ..............................................................................................................................84
3.2.5 Routing at the Bottom ........................................................................................................................................85
3.2.6 Connecting Signal Cables ..................................................................................................................................89
3.2.6.1 Connecting a Remote EPO Switch ..................................................................................................................89
3.2.6.2 Connecting Communications Cables ...............................................................................................................90
3.3 (Optional) Combining Cabinets ............................................................................................................................92
3.4 Installing a Double-Bus (2N) System ....................................................................................................................93
3.4.1 Connecting Power Cables ..................................................................................................................................93
3.4.2 Connecting Signal Cables ..................................................................................................................................95
3.5 Installation Verification .........................................................................................................................................95
4 User Interface .......................................................................................................................... 98
4.1 LCD Interface ......................................................................................................................................................98
4.1.1 LCD Menu ........................................................................................................................................................98
4.1.1.1 Menu Hierarchy ..............................................................................................................................................98
4.1.1.2 Initial Startup ..................................................................................................................................................98
4.1.1.3 Main Menu .....................................................................................................................................................99
Issue 09 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
Contents
v

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents